Customers Responsibilities before delivery:
· Each trailer will need to have a garden hose with a minimum water pressure of 40 psi and a flow rate of 5 gallons per minute at the trailer. It is your responsibility to have a garden hose that can reach the trailer.
· Each trailer will need one dedicated 20 amp power circuits (no other power draw on each circuit). It is your responsibility to supply power cables to the trailer and insure that the lines and the circuit they are tied too have no other power draw on them.
· Be sure that each power cord is properly sized (gauge) for the distance it will run and the 20 amps it will draw
· The location of the unit needs to be level and dry. Access is needed by a truck to service the unit each day.
|
|||
| Like us on Facebook | Follow our Blog | Follow us on Pinterest |
Get Our
Newsletter |
